The shore power system at the Port of San Diego B Street Cruise Ship Terminal is a dual-voltage system meeting California’s aggressive clean air requirements. The system allows for easy reporting of power consumption and helps the Port provide emission calculations.
• Marine
• Contract: $2,750,000
• San Diego, CA
• Completed 2010