Portfolio: Seattle Shore Power Relocation Terminal 91

Views

Cochran recently completed the relocation of both the Princess Cruise Lines and Holland America Lines Shore Power Systems from Seattle Terminal 30 to Terminal 91. As part of the relocation project, Cochran also designed and developed a cable positioning device that is able to automatically adjust to the tide and an automation system for the shore power equipment allowing the system to be configured for any vessel in the system’s database with the touch of a button and connection data to be gathered automatically upon connection.

We are currently under contract for all Maintenance and Support of the Shore Power Systems including Coordination Studies for the ships, Equipment Testing and Commissioning before each sailing season begins, and weekly Shore Power Connection support when ships dock.